Show simple item record

dc.contributor.advisorAlegría Gutiérrez, Natalia ORCID
dc.contributor.advisorLoroño Lucena, José Ignacio
dc.contributor.authorCano Hazas, José Antonio
dc.contributor.otherMáster en Ingeniería Energética Sostenible
dc.contributor.otherIngeniaritza Energetiko Iraunkorra Masterra
dc.date.accessioned2021-11-22T16:50:14Z
dc.date.available2021-11-22T16:50:14Z
dc.date.issued2021-11-22
dc.identifier.urihttp://academico.ehu.eus/handle/123456789/32582
dc.identifier.urihttp://hdl.handle.net/10810/53949
dc.description.abstractEste trabajo de fin de master se ha basado en el análisis de equipos de una central hidroeléctrica tipo para mediante ello realizar un plan básico de mantenimiento preventivo. Para ello se ha realizado la descripción de cada una de las partes de una central, para posteriormente detectar y definir los puntos sobre los que incidir con los trabajos de mantenimiento. Mediante los cuales de ha elaborado el plan de mantenimiento anual, organizando cada uno de ellos de manera equitativa a lo largo del año según su periodicidad. Por último, se ha adaptado dicho plan general a un caso real, acoplándolo a la central hidroeléctrica de Sollano, ubicada a pie de presa del embalse de Ordunte.es_ES
dc.description.abstractMaster-amaierako lan honetan, eredu gisa hautatu den zentral hidroelektriko bateko ekipoak aztertu dira. Behin ekipoen analisia egin delarik, oinarrizko mantentze-plan prebentiboa burutu da. Horretarako, zentral baten atalak deskribatu dira. Honela, mantentze-lanak zein ataletan burutu behar diren identifikatu da. Horren arabera, urteko mantentze plan antolatu bat definitu da, mantentze lanak urtean zehar era ekitatiboan antolatuz eta aldizkakotasunaren arabera ezarriz. Azkenik, plan mantentze-plan orokorra, kasu erreal batera egokitu da. Esaterako, Ordunteko urtegiaren presaren ondoan dagoen Sollanoko zentral hidroelektrikora aplikatuz.es_ES
dc.description.abstractThis final master project (master's thesis) is based on the equipment analysis of a model hydroelectric plant. This analysis allows to stablish and develop a basic preventive maintenance plan. To achieve this aim, a detailed description of each part of the plant was carried out. Then, the target points were detected and defined to apply them the maintenance tasks. Based on these target points, the annual maintenance plan was elaborated, arranging each one in a equitative way depending on its periocity throughout the year. Finally, this plan was adapted to a real case, couppling it to Sollano hydroelectric plant. This plant was located nearby Ordunte reservoir dam.es_ES
dc.language.isospaes_ES
dc.rightsinfo:eu-repo/semantics/openAccess
dc.rights.urihttp://creativecommons.org/licenses/by-nc-sa/3.0/es/
dc.subjectcentral hidroeléctricaes_ES
dc.subjectplan de mantenimiento
dc.subjectturbina
dc.subjectembalse
dc.subjectalternador
dc.subjectSollano
dc.subjectzentral hidroelektrikoa
dc.subjectmantentze-plana
dc.subjectturbina
dc.subjecturtegia
dc.subjectalternadorea
dc.subjecthydroelectric plant
dc.subjectmaintenance plan
dc.subjectturbine
dc.subjectreservoir
dc.subjectalternator
dc.titleRealización de un plan básico de mantenimiento preventivo para una central hidráulica y adaptación del mismo a un caso reales_ES
dc.typeinfo:eu-repo/semantics/masterThesis
dc.date.updated2021-09-10T07:43:35Z
dc.language.rfc3066es
dc.rights.holderAtribución-NoComercial-CompartirIgual (cc by-nc-sa)
dc.identifier.gaurregister118262-977116-11es_ES
dc.identifier.gaurassign104142-977116es_ES


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record

Atribución-NoComercial-CompartirIgual (cc by-nc-sa)
Except where otherwise noted, this item's license is described as Atribución-NoComercial-CompartirIgual (cc by-nc-sa)