Show simple item record

dc.contributor.authorAbadie, L.M.
dc.contributor.authorGoicoechea, N.
dc.date.accessioned2023-08-16T11:13:29Z
dc.date.available2023-08-16T11:13:29Z
dc.date.issued2022
dc.identifier.citationEnergy: 252: 123974 (2022)es_ES
dc.identifier.urihttp://hdl.handle.net/10810/62213
dc.description.abstractConcern for the environment led in some developed countries to planning future energy use that combines greater electrification with increasing use of Renewable Energy (RE) in the electricity generation mix. These scenarios can affect Security of Supply (SoS) because the intermittence of RE, its stochastic nature as an electricity generation sources and the demand's behaviour. It is necessary to increase storage capacity, among other measures. This paper analyses the effects of an optimal management strategy based on prices for Pumped Hydro Storage plants (PHES) using a daily mean reverting jump diffusion stochastic model of electricity prices in a risk neutral world including daily seasonality. Results show that a) income with this strategy under uncertainty may be insufficient compared to investment costs; b) the strategy does not usually provide proper guarantees as regards SoS at times of high demand for electricity; c) the technical characteristics of PHES such as the maximum upper & lower reservoir volume are highly significant. The effect of a minimum reservoir capacity at times of high demand is also analysed. PHES profitability can be improved under a Generating Company (GENCO) strategy coordinated with a wind farm and if the avoided CO2 emissions are taken into account. © 2022 Elsevier Ltdes_ES
dc.description.sponsorshipThis research is supported by the Basque Government through the BERC 2018–2021 programme and by the Spanish Ministry of Economy and Competitiveness ( MINECO ) through BC3 María de Maeztu excellence accreditation MDM-2017-0714 . Further support is provided by the project MINECO RTI 2018-093352-B-I00 .es_ES
dc.language.isoenges_ES
dc.publisherEnergyes_ES
dc.relationinfo:eu-repo/grantAgreement/MINECO/MDM-2017-0714es_ES
dc.rightsinfo:eu-repo/semantics/openAccesses_ES
dc.rights.urihttp://creativecommons.org/licenses/by-nc-sa/3.0/es/*
dc.subjectElectrity pricees_ES
dc.subjectOptimal operationes_ES
dc.subjectPumped hydro storagees_ES
dc.subjectSecurity of supplyes_ES
dc.titleOptimal management of a mega pumped hydro storage system under stochastic hourly electricity prices in the Iberian Peninsulaes_ES
dc.typeinfo:eu-repo/semantics/articlees_ES
dc.rights.holder© 2022 The Authors.es_ES
dc.rights.holderAtribución-NoComercial-CompartirIgual 3.0 España*
dc.relation.publisherversionhttps://dx.doi.org/10.1016/j.energy.2022.123974es_ES
dc.identifier.doi10.1016/j.energy.2022.123974


Files in this item

Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record

© 2022 The Authors.
Except where otherwise noted, this item's license is described as © 2022 The Authors.